Lean and BIM Interaction in a High Rise Building
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
Pontificia Universidad Católica del Perú. Facultad de Arte y Diseño
Acceso al texto completo solo para la Comunidad PUCP
Abstract
Lean Design has been spreading its use in the AEC industry along with the emergence of Building Information Modelling (BIM).Those two methodologies; Lean and BIM are being implemented first independently and then together. as new means to deliver more efficient projects. This paper researches some tools of Lean and BIM that permit a positive interaction by focusing on a case study related to a high rise building for residential use. Those tools are; from Lean Construction, set based design and value stream mapping. From BIM were used a 3D model and Integrated Concurrent Engineering (ICE) sessions. Also, the paper describes the interaction between those tools in the design phase and its impact in the construction stage.
Description
Keywords
Lean design, BIM, Set based design, Value stream, Ice session
Citation
Collections
Endorsement
Review
Supplemented By
Referenced By
Creative Commons license
Except where otherwised noted, this item's license is described as info:eu-repo/semantics/openAccess

