Lean and BIM Interaction in a High Rise Building
View/ Open
Date
2021Author
Chuquín, Frank
Chuquín, Cristhian
Saire, Romina
Metadata
Show full item recordAbstract
Lean Design has been spreading its use in the AEC industry along with the emergence of Building Information Modelling (BIM).Those two methodologies; Lean and BIM are being implemented first independently and then together. as new means to deliver more efficient projects. This paper researches some tools of Lean and BIM that permit a positive interaction by focusing on a case study related to a high rise building for residential use. Those tools are; from Lean Construction, set based design and value stream mapping. From BIM were used a 3D model and Integrated Concurrent Engineering (ICE) sessions. Also, the paper describes the interaction between those tools in the design phase and its impact in the construction stage.