Show simple item record

dc.contributor.authorRivasplata Ramírez, Arnold Rubén
dc.contributor.authorGarcía Carpio, Raúl Lizardo
dc.date.accessioned2018-06-28T15:27:01Z
dc.date.available2018-06-28T15:27:01Z
dc.date.issued2018-04
dc.identifier.urihttp://repositorio.pucp.edu.pe/index/handle/123456789/126786
dc.description.abstractSe analiza el comportamiento de los grupos de generación eléctrica que toman decisiones sobre inversión y producción, en un escenario de mercado liberalizado introduciendo contratos de largo plazo, en un contexto donde hay alto nivel de concentración de mercado. Para ello, se emplea un modelo determinístico dinámico de competencia imperfecta (con estrategias open loop) que se resuelve utilizando un sistema de ecuaciones complementarias mediante el software GAMS, a fin de proveer simulaciones que muestren los impactos de las diferentes estructuras de mercado (monopolio, oligopolio con franja competitiva, oligopolio (Cournot) y competencia perfecta) sobre las decisiones de inversión y producción, asumiendo la existencia de dos bloques horarios (base y pico) y considerando la existencia de dos tecnologías a utilizarse para el despacho eléctrico (hidráulica y térmica) con datos del año base 2011 para un horizonte temporal de 10 años. Los resultados muestran que a pesar de que en los diferentes escenarios de análisis puedan existir indicios de poder de mercado, existe un efecto positivo importante sobre la inversión en capacidad, la producción por tecnología, y precios por bloque de horario. Para un mercado oligopólico con franja competitiva, se observa que contratando el 70% de energía hidráulica y el 66% de energía térmica en el año base, la inversión en capacidad con tecnología hidráulica incrementa en 7,18% (sobreinversión) y con tecnología térmica disminuye en 2,27% (subinversión); mientras que la producción, con tecnología hidráulica incrementa en 3,67%, mientras que bajo tecnología térmica, 4,58%. El precio en hora base disminuye en 9,83% y en hora pico, 4,45%. We analyze the behavior of electricity generation groups that take investment and production decisions in a liberalized market scenario by introducing long-term contracts, in a context where there is a high level of market concentration. In this way, a dynamic deterministic model of imperfect competition (with open loop strategies) is used, which is solved using a system of complementary equations through GAMS software, in order to provide simulations that show the impacts of the different market structures (monopoly, oligopoly with competitive fringe, oligopoly (Cournot) and perfect competition) on the decisions of investment and production, assuming the existence of two segment loads (base and peak) and considering the existence of two technologies to be used for the electric power dispatch (hydraulic and thermal) with 2011 data for 10-year planning horizon. The results show us that although there may be indications of market power in the different analysis scenarios, there is a significant positive effect on investment in capacity, production by technology, and prices per segment loads. For an oligopolistic market with a competitive fringe, it is observed that by contracting 70% of hydraulic energy and 66% of thermal energy in the base year, investment in capacity with hydraulic technology increases by 7.18% (overinvestment) and with thermal technology decreases by 2.27% (underinvestment); while production, with hydraulic technology, increases by 3.67%, while under thermal technology, 4.58%. The price in base load decreases by 9.83% and in peak load, 4.45%.en_US
dc.language.isospaes_ES
dc.publisherPontificia Universidad Católica del Perú. Departamento de Economíaes_ES
dc.relation.ispartofurn:issn:2079-8466
dc.relation.ispartofurn:issn:2079-8474
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/2.5/pe/*
dc.subjectDecisiones de inversiónes_ES
dc.subjectEquilibrio de Nashes_ES
dc.subjectJuegos dinámicoses_ES
dc.subjectMercado eléctricoes_ES
dc.subjectOligopolioes_ES
dc.subjectOptimizaciónes_ES
dc.subjectPoder de Mercadoes_ES
dc.subjectTeoría de juegoses_ES
dc.subjectInvestment Decisionses_ES
dc.subjectNash Equilibriumes_ES
dc.subjectDynamic Gameses_ES
dc.subjectElectricity Marketes_ES
dc.subjectOligopolyes_ES
dc.subjectOptimizationes_ES
dc.subjectMarket Poweres_ES
dc.subjectGame Theoryes_ES
dc.titleDinámica de inversión y competencia en generación eléctrica en un escenario de liberalización en el Perú: La importancia de los contratos de largo plazoes_ES
dc.typeinfo:eu-repo/semantics/workingPaper
dc.type.otherDocumento de trabajo
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#5.02.00
dc.publisher.countryPE
dc.identifier.doihttp://doi.org/10.18800/2079-8474.0457


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/openAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/openAccess