dc.contributor.advisor | Guevara Sánchez, Daniel Eduardo | |
dc.contributor.author | García León, Luis Robert | es_ES |
dc.contributor.author | Gutarra Rojas, Ronald Javier | es_ES |
dc.contributor.author | Silva Fernández, Karla Noedith | es_ES |
dc.date.accessioned | 2018-04-05T23:54:58Z | |
dc.date.available | 2018-04-05T23:54:58Z | |
dc.date.created | 2017 | |
dc.date.issued | 2018-04-05 | |
dc.identifier.uri | http://hdl.handle.net/20.500.12404/11841 | |
dc.description.abstract | Esta investigación se ha desarrollado con el objetivo de analizar la brecha entre los plazos y
costos reales y los normados para cinco aspectos vinculados a la facilidad para hacer
negocios en la ciudad de Trujillo; así como para describir la diferencia entre hacer negocios
en la ciudad de Trujillo y en Lima, calculando la distancia a la frontera con otras ciudades
colombianas y comunidades españolas. Es un estudio descriptivo, con enfoque cuantitativo al
usar cuestionarios para recopilar los datos. La metodología que se usa es la del Doing
Business que fue desarrollada en el año 2002 por el Banco Mundial. Los cinco aspectos que
se analizan son: (a) apertura de una pequeña o mediana empresa, (b) obtención de permiso de
construcción para un almacén, (c) conexión de electricidad para un almacén, (d) registro de
una propiedad que se adquiere por un proceso de compra-venta entre dos entidades
debidamente registradas en el país, y (e) cumplimiento de contratos, que se refiere a la
recolección de deudas y contratos de arrendamiento cuando se hace necesario acudir a un
juzgado civil para solventar una disputa. Los resultados de la investigación permiten concluir
que en la ciudad de Trujillo hay mayores facilidades para hacer negocio que en Lima, en lo
que se relaciona a la apertura de una empresa y la obtención de permisos de construcción.
Mientras que en obtención de una nueva conexión para electricidad, el plazo es ocho veces
superior al de la capital, por la extensión limitada de la red de distribución y en el aspecto de
registro de propiedades también hay mayor plazo que en Lima, como consecuencia de
demoras en el registro final de la transferencia. Debe destacarse que en todos los aspectos
analizados, los costos son inferiores a los de otras ciudades y se tiene una distancia a la
frontera cercana a los 60 puntos en tres de los cuatros elementos que se analizaron. En lo que
se refiere a la solución de conflictos se encontró que existen demoras procesales, lo cual
causa que se necesiten 262 días para contar con una sentencia, a lo cual se le deben sumar
cuatro o cinco meses desde que se introduce la demanda hasta que se inicia el juicio | es_ES |
dc.description.abstract | This research was developed with the objective of analyzing the gap between the actual and
standard costs and terms for five aspects related to the ease of doing business in the city of
Trujillo; also to describe the difference between doing business in Trujillo and in Lima,
calculating the distance to the border with other Colombian and Spanish cities. This is a
descriptive study, with a quantitative approach when using questionnaires to collect the data.
The methodology used is the Doing Business, which was developed in 2002 by the World
Bank. The five aspects analyzed are: (a) opening a small or medium-sized enterprise by a
local entrepreneur, (b) obtaining a construction permit for a warehouse, (c) electricity
connection to a warehouse, (d) a property acquired through a buy-sell process between two
entities duly registered in the country; and (e) compliance with contracts, which refers to the
collection of debts and leases when it is necessary to go to a civil court to settle a dispute. The
results of the investigation allow to conclude that in the city of Trujillo there are more
facilities for doing business than in Lima, as it relates to the opening of a company and the
obtaining of building permits. While obtaining a new connection for electricity, the term is
eight times higher than the capital, due to the limited extent of the distribution network and in
the property registration aspect there is also a longer term than in Lima as a result of delays In
the final record of the transfer. It should be emphasized that in all aspects analyzed, the costs
are lower than those of other cities and a distance to the border near the 60 points exists in
three of the four elements that were analyzed. Regarding the resolution of conflicts, it was
found that there are procedural delays, which causes that 262 days are needed to have a
sentence, to which must be added four or five months from the time the suit is filed until the
trial begins | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Pontificia Universidad Católica del Perú | es_ES |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/2.5/pe/ | * |
dc.subject | Nuevas empresas | es_ES |
dc.subject | Emprendimiento (Administración) | es_ES |
dc.subject | Investigación cuantitativa | es_ES |
dc.title | Facilidad para hacer negocios en la ciudad de Trujillo | es_ES |
dc.type | info:eu-repo/semantics/masterThesis | es_ES |
thesis.degree.name | Maestro en Administración Estratégica de Empresas | es_ES |
thesis.degree.level | Maestría | es_ES |
thesis.degree.grantor | Pontificia Universidad Católica del Perú. CENTRUM | es_ES |
thesis.degree.discipline | Administración Estratégica de Empresas | es_ES |
dc.type.other | Tesis de maestría | |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#5.02.04 | es_ES |
dc.publisher.country | PE | es_ES |
renati.discipline | 413307 | es_ES |
renati.level | https://purl.org/pe-repo/renati/level#maestro | es_ES |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_ES |